PCS Allan

XMD was awarded a contract to perform rehabilitation work at their site. XMD has a roadheader that is attached to the front of a scoop and a power pack that is pulled behind the scoop. This makes it very compact and easy to transport throughout the mine.

Image Gallery

View the embedded image gallery online at:
http://xtrememining.com/news/item/30-pcs-allan#sigProId5a15fd7b79